per TSWG meeting on 21SEP2020, TASK:
Establish Task Force for a Layer 1-2 Spec Deliverable
- Members: Drummond Reed Darrell O'Donnell Kevin Griffin
- Due Date: 30-Sep-20
Task Force Charter - a basic what's in/out for scope:
Technical Interoperability definition for the interactions between Layer 1 (_____) and Layer 2
Focus should be on:
- REQUIRED
- CRUD for:
- DID - Anchoring DIDs with key rotation (includes possible KERI support)
- DID Document
- anything else?
- Sovrin/Indy:
- CredDefs
- SchemaDefs
- what else?
- CRUD for:
- OPTIONAL(Limited list of OTHER items):
- DID Document serving (CRUD)
- do we need anything as granular as getNodes() / getConsensusStatus() / getObservers()...
- How should the Layer 1/2 spec tie in with Layer 1 governance frameworks (coordinate with GSWG)
Task Force Scope:
- Define what a Layer 1/2 Specification MUST and SHOULD include.
- Stick to the bare minimum. If a system can do various operations normally at a higher-layer, or if tailoring is required at a higher layer, it may belong there.