Kick-off Meeting (Will repeat info from 2020-06-01)
08, June 2020 — 8:30AM IST, 11 AM Singapore, Noon JST, 8PM US PT, 11PM US ET
Send an email to technical-stack-wg@lists.trustoverip.org to request a calendar invite (you can subscribe to the mailing list at lists.trustoverip.org).
Agenda
Guiding Goal: Organize the working group.
- Welcome from the conveners (Dan, Matt—5 min)
- Introductions (WG, 15 min)
- Mission and scope of this WG (Matt — 10 min)
- Potential initial work items (Dan — 15 min)
- Logistics (Matt—10 min)
- Mailing list
- Wiki
- Github repo structure (repository of best practices)
- Task Forces
- Chairs
- Meeting schedule
The meeting presentation is attached to this page.
Meeting Notes
Recording:
Participants:
Abilash Soundararajan: Banglore: Truthshare.tech.
Dan Bachenheimer
Matt Davies
Adrian Gropper
Eric Drury
Vinod Panicker, Kochi, India, Wipro.
Additional Desired Outcomes:
Vinod: Propose starting APAC 1 hour later in APAC.
Vinod: How do pull requests become merged into mainlines?
Vinod: Are there any specific maintainers who can validate PR's?
Abilash: Is there a top-level white paper that is being written, and, if so, how to contribute?
Messages to mailing list to be sent:
Call for volunteers (Dan)
Call for term duration (Matt)
Call for APAC start time preference. (Dan)
Chair Volunteers (3 max)
No new volunteers.